Kudankulam Unit 3 Reactor Building Dome Installed Posted on April 1, 2023 by admin The lower part and the top part of the 281-tonne dome for the reactor building at unit 3 of India’s Kudankulam nuclear power plant was preassembled on the ground before being lifted 62 metres and installed in the design position